REPAIR, MAINTENANCE AND MODIFICATIONS IN THE BYE PASS GATES IN ACCORDANCE WITH THE REDESIGNED WHEEL ASSEMBLY ARRANGEMENT WITH NEW WHEEL ASSEMBLIES, RELOCATION OF ITS HYDRAULIC HOISTING INCLUDING REFURBISHMENT AND MODIFICATION IN HYDRAULIC PRESSURE UNIT AT FOUR HYDEL POWER PLANTS ON BATHINDA BRANCH CANAL